Sprig HQ Battery & PV Installation
Sprig is among the first electrical contractors in the nation to pair Tesla’s Powerpack battery with a 350 kW commercial roof-mount photovoltaic (PV) system to optimize energy savings. The pairing, installed by Sprig at their corporate headquarters in San Jose, will cut the building’s total energy costs by 80-95%.
The components of the system include 1,177 smart modules (solar panels) that are spread over 20,000-sq-ft of the building’s roof top. The 500kWh/250 kW Tesla Powerpack battery system is installed in the Sprig Electric parking lot and is connected to the grid and the PV system. In addition to five 100 kW Powerpack commercial batteries, the system includes a 250 kWh inverter and a DC combiner. The footprint is approximately 10’ x 16’. This system has been in place for 3-years and has now paid for itself. Sprig proudly uses this state-of-the art battery and PV combo as a showcase for clients who are interested in eliminating their carbon footprint.
Quick Facts
LOCATION
San Jose, CA
MARKET SECTOR
Commercial Office, Renewable Energy
GENERAL CONTRACTOR
Sprig Electric
SYSTEMS INSTALLED
Photovoltaic, Electrical
PROJECT DETAILS
- Design-Build
- Prefabrication
- Non-Penetrating Rooftop-Mount
- 500 kWh, 250 kW Battery Size
- 350 kW PV Size
- 20,000-Sq-Ft
- 1,177 Smart Modules