Confidential Client
This was the site of a new campus and customer service center for one of our top clients. The campus is a CommScope certified site. The project included two buildings; one 3-story office building and one single story with dedicated training rooms, an auditorium, a shipping/receiving center, and a cafeteria. The site also included an expansive parking area as well as future campus expansion space.
The office building included raised floor installation throughout the entire building. The project included the installation of approximately 2,100 unique station outlets across all floors. Each station included two data ports for a wire network, wireless network and VOIP communications. This site included an intricate infrastructure for a digital signage system requiring support from by RG6 and Category 6e fiber optic ties. Sprig installed a large server room with an APC hot aisle containment system and category 3 feeders throughout.
This project incorporated the installation of all the network equipment, servers, and patching at all levels of the network. Sprig also assisted with the overall site turn-up for the network alongside the customer.
Quick Facts
LOCATION
Salt Lake City, UT
MARKET SECTOR
Corporate Campus
GENERAL CONTRACTOR
Confidential Client
PROJECT VALUE
$1,400,000
SYSTEMS INSTALLED
Data Communications
PROJECT DETAILS
- CommScope Certified Site
- 7-IDF Rooms
- 1-MPOE/POP